Catenary comes down at Wabtec's fabled former GE test track

RELATED TOPICS: INFRASTRUCTURE | SUPPLIERS | LOCOMOTIVES
Trains Industry Newsletter
Get a weekly roundup of the industry news you need.
By signing up you may also receive occasional reader surveys and special offers from Trains magazine. View our privacy policy.
EastErieCatenarySteveKoenig
Crews with Winters Rigging and the East Erie Commercial Railroad work to remove catenary along Wabtec's test track in Harborcreek, Pa.
Stephan M. Koenig
ERIE, Pa. — The catenary is coming down.

Crews from Winters Rigging and the East Erie Commercial Railroad descended on the former GE Transportation test track in Harborcreek, Pa., to remove the catenary that has been above it for many years. The removal was in response to years of neglect and damage, most recently from copper thieves.

The catenary has been a part of the test track long before it was a test track, wires have been over these tracks since it was part of the Buffalo and Lake Erie Traction Company main line in 1906.

When GE began to develop electric locomotives the catenary on the 4-mile line was crucial to theirs and other locomotive development. This included the Pennsylvania Railroad's famous GG1 locomotives.

In the 1960s the system was rebuilt to handle the newer foreign and domestic electric locomotives as well as multiple-unit car development that GE also was involved in during the 1960s and 1970s. The electrification of the catenary lasted into the 1990s when preference for diesel locomotives and lagging electric locomotives sales prompted GE to mothball the catenary in place.

Damage from a downed tree in 2016 severed the wires in one spot on the line but it was cleaned up in that location and left in place until this past weekend. The area where it was severed was hit by copper thieves causing damage that brought a section of the wires down, fouling the tracks. This resulted in a closure of the test track for 3 days. It was also found that some of the wooden poles were rotten through, creating a potential safety hazard to crews operating on the line.

Some of the hardware will be retained for now and sources close to the East Erie Commercial Railroad and Wabtec say they had not closed the door on building electric locomotives at the Erie plant. Work to remove the catenary is expected to be completed by Wednesday.

NEWSWIRETrains News Wire

  • Previous Day
  • August 27, 2019
  • Next Day
Leave a Comment
Want to leave a comment?
Only registered members of TrainsMag.com are allowed to leave comments. Registration is FREE and only takes a couple minutes.

Login or Register now.
Please keep your feedback on-topic and respectful. Trains staffers reserve the right to edit or delete any comments.
0 COMMENTS
FREE DOWNLOAD

FREE DOWNLOAD

The Genesee & Wyoming 

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy
Subscribe Up To 58% off the newsstand price!
Subscribe To Trains Mag Today
+