The Golden Spike and other notable track completion ceremonies in the U.S. and Canada

From west to east, dates and locations for 27 railroad completion celebrations
Transcontinental railroad completions in U.S. and Canada
Notable U.S. and Canadian railroad completions
Trains: Rick Johnson
Promontory Summit, Utah, may have hosted North America’s most famous final-spike ceremony, but the event on May 10, 1869, was not unique. Not all railroads had a completion “moment:” the New York Central is an example of a railroad formed through a series of mergers and consolidations, and others were built on multiple fronts and gradually placed into service.

Our research turned up 26 other last-spike events, some predating the Transcontinental Railroad, and one as recent as 1956. We suspect this is not an exhaustive list and welcome information on additional such ceremonies.

Want to find out more about the Transcontinental Railroad? 

Facts, figures, history, and more are available from our special 
Journey to Promontory magazine, available at our partner shop, the Kalmbach Hobby Store.


WASHINGTON
Great Northern

Jan. 6, 1893, Madison, Wash. (now Scenic, Wash.) Only two GN o¬fficials are present for the spike-driving ceremony, according to “The Great Northern Railway: A History” (Hidy, Hidy, Scott, and Hofsommer).

Spokane, Portland & Seattle
March 11, 1908, at Sheridan’s Point, Wash., milepost 50.5. Completes the Portland & Seattle’s line from Kennewick, Wash., to Vancouver, Wash.

CALIFORNIA
Western Pacific

Nov. 1, 1909, Keddie, Calif. The last spike is driven “without ceremony” on the steel bridge curving over Spanish Creek, according to David F. Myrick’s “Western Pacific: The Last Transcontinental Railroad.”

ALASKA
Alaska Railroad

July 15, 1923, North Nenana, Alaska. President Warren G. Harding misses twice before connecting to drive the spike home. In poor health, he dies in San Francisco on the return trip from the ceremony to Washington, D.C.

BRITISH COLUMBIA
Pacific Great Eastern (BC Rail)

Sept. 12, 1952, milepost 369.1 near Ahbua Creek, B.C. June 10, 1956, milepost 26.2 near Britannia Beach, B.C. On the first date, a silver spike marks the completion of the route from Squamish, B.C., to Prince George; on the second, a copper spike marks the completion of the extension from Squamish to North Vancouver.

Grand Trunk Pacific
April 7, 1914, 1 mile east of Fort Fraser, B.C. Completes route from Winnipeg to Prince Rupert

Canadian Pacific
Nov. 7, 1885, Craigellachie, B.C. Donald Smith, later known as Lord Strathcona, drives the last spike.

Canadian Northern
Jan. 23, 1915, Basque, B.C. Completes route from Montreal to Vancouver. Bankruptcy of Grand Trunk Pacific and Canadian Northern, among others, led to creation of Canadian National in 1918.

MONTANA
Northern Pacific

Aug. 22, 1883, Independence Gulch, Mont. A formal ceremony with four trains of guests, including former President Ulysses S. Grant, is held at the more scenic Gold Creek, Mont., on Sept. 8, 1883, fulfilling NP President Henry Villard’s desire for a large event to generate publicity.

Milwaukee Road
March 29, 1909, just east of Missoula, Mont. Completes the railroad’s Western Extension. Last-spike ceremonies were not held until May 19, 1909, at Gold Creek, Mont., 7 miles west of Garrison, Mont.

UTAH
Central Pacific/Union Pacific

May 10, 1869, Promontory Summit, Utah. The most famous of all Last Spike ceremonies, completing the Pacific Railroad.

Denver & Rio Grande
March 30, 1883, west of Green River, Utah

NEW MEXICO
Fort Worth & Denver City

March 14, 1888, at Union Park, New Mexico Territory (near the present Folsom, N.M.) Completes the route between its namesake cities.

TEXAS
Texas & Pacific

Dec. 15, 1881, Sierra Blanca, Texas. Jay Gould drives a silver spike to join the T&P to the Southern Pacific, according to an agreement reached by Gould and SP’s C.P. Huntington on Nov. 26, 1881.

Southern Pacific
Jan. 12, 1883, Pecos River bridge, near Comstock, Texas. Completes Sunset Route from California to New Orleans.

Kansas City Southern
Sept. 11, 1897, near Beaumont, Texas. Completes through route from Kansas City to Port Arthur, Texas, for the predecessor Kansas City, Pittsburg & Gulf Railroad.

WISCONSIN
Green Bay & Western

December 1873, Marshland Junction, Wis. (near East Winona, Wis.) Completing predecessor Green Bay & Minnesota’s route from Green Bay to the Mississippi River, built in 25 months. Roadmaster B.P. Roberts, who had driven the first spike, also drives the last at a junction with the Chicago & North Western.

MINNESOTA
Minneapolis & St. Louis

Nov. 12, 1877, Albert Lea, Minn. Completion of the main line between the namesake cities. Don L. Hofsommer’s “The Tootin’ Louie” notes the last spike is driven “shortly before the arrival of a splendidly appointed excursion train from Minneapolis, which stopped only briefly before hurrying on to ceremonies at the state line and then returning for a ‘sumptous repast’ and jovial ‘speech-making’ at the Hall House.”

OHIO
New York, Chicago & St. Louis (Nickel Plate Road)

1882, Bellevue, Ohio. Chicago-Bu¬ffalo route is completed Sept. 1, 1882. Taylor Hampton’s 1947 book “The Nickel Plate Road” says Bellevue held an elaborate ceremony with a nickel-plated spike at its roundhouse (without specifying a date), but an article on the City of Bellevue website quotes a 1932 Bellevue Gazette article saying the spike was never actually driven (without explaining why).

ILLINOIS
Illinois Central

Sept. 27, 1856, south of Eff¬ingham, Ill. Marks completion of the original charter lines, a Y-shaped system from Dunleith in northwestern Illinois and Chicago in the northeast to Cairo. At the time of its completion, the 705-mile railroad is the world’s longest.

NEW YORK
Erie

April 19, 1851, at Cuba, N.Y. Completes the line between the Hudson River and Lake Erie for predecessor New York & Erie.

PENNSYLVANIA
Pennsylvania Railroad

Feb. 15, 1854, Horseshoe Curve. Completes the Mountain Division, allowing through service from Harrisburg to Pittsburgh. While several books note the event, none mention an accompanying ceremony.

WEST VIRGINIA
Baltimore & Ohio

Dec. 24, 1852, Rosbys Rock, near Moundsville, W.Va. Completes the original line from Baltimore to the Ohio River; a celebration of the opening is held Jan. 11, 1853, in Wheeling, W.Va.

VIRGINIA
Seaboard Air Line

June 2, 1900, Richmond, Va.
Last spike is driven at Main Street Station, symbolizing the completion of the SAL as a consolidated company.

Virginian
Jan. 29, 1909, west end of the New River Bridge, Glen Lyn, Va. The celebration of completion was not held until April 1909 in Norfolk, Va.

Clinchfield
Feb. 8, 1915, at Trammel, Va. Last spike was at the south siding switch. A “golden spike” ceremony was held the next day.

Downloadable File(s)
Leave a Comment
Want to leave a comment?
Only registered members of TrainsMag.com are allowed to leave comments. Registration is FREE and only takes a couple minutes.

Login or Register now.
Please keep your feedback on-topic and respectful. Trains staffers reserve the right to edit or delete any comments.
0 COMMENTS
ROAD TO OBLIVION

ROAD TO OBLIVION

Free download

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy
Subscribe Up To 54% off the newsstand price!
Subscribe To Trains Mag Today
+